Čortanovci Viaduct, Novi Sad, Serbia
Projektinformation
Plats: Novi Sad, Serbien
- Support for the construction of the 2.90 km long Čortanovci Viaduct within the Budapest-Belgrade-Skopje-Athens international railway link
- The viaduct is located on the section between Stara Pazova and Novi Sad as part of the double-track, open railway line and is supported by 59 columns
- The bridge is divided into a total of five sections A to E, whereby PERI was significantly involved in the construction of sections B and C
Krav
- Realisation of the project within the tight construction schedule
- High load transfer with support heights of up to 24.00 m
- Use of a crane
- Efficient work with high level of safety for site personnel
Kunder
Main Contractor
RZD International
Subcontractor
Karin Komerc MD
Kundfördelar
- Substantial simplification of assembly work due to the possibility of combining PERI systems on the basis of the modular principle in the common, metric basic grid
- Project-specific adaptation to geometries and loads in 25 cm steps
- Force-fit connections and flexible connection points when combining scaffolding and formwork solutions
- Time-saving relocation of the permanently mounted climbing units by crane lift
- Fast work due to simplified planning and assembly of the standardised, coordinated components
- Realisation of the project within the tight construction schedule
- Increased safety for construction site personnel
- Individual planning, consulting and support on site by PERI engineers
PERI lösning
- Flexible combination of PERI UP as well as components from the VARIOKIT Engineering Construction Kit for realising the 18.50 m high delta piers
- Erection of the columns using CB Climbing Units as working platforms in combination with the TRIO and VARIO GT 24 Wall Formwork Systems
- Use of MULTIFLEX Girder Slab Formwork for concreting the two-lane superstructure
- Support of the MULTIFLEX by PERI UP with a support height of 20.00 m in section C
- Installation of ALPHAKIT Towers and Lattice Girders for load transfer as well as the creation of horizontal working platforms in section B
- Assembly of the lightweight ALPHAKIT system components on the ground and by hand: crane use only required for positioning
- Use of PROKIT EP 110 Guardrail to protect against open building edges
- Advance planning and support for system implementations