Tošanovice-Žukov Bridge, Czech Republic

Projektinformation

Plats: Ostrava, Tjeckien

Design: steel composite bridge
Length: 720 m

Krav

The strut axes open out from 6.50 m to 9.00 m in the centre of the bridge.

Kunder

Metrostav a.s., Division 4, Prague

Kundfördelar

  • flexible connecting possibilities for steel walers, scaffold tubes, heavy-duty spindles and tie rods
  • can be adapted to various main beam spacings
Martin Šimek, Site Manager
Martin Šimek
Site Manager

The erection of steel composite bridges is considerably easier and much faster with the PERI formwork carriage construction.

PERI lösning

Two modular formwork carriages from the VARIOKIT system